Why Engineers Specify

We create opportunities to optimize supporting beams and reinforcement during the structural design stage.
C-Joist reduces reinforcement demand in many beams, opening the door to more efficient structural design and potential savings in steel, materials, and construction.

A lighter system starts with a smarter structure.
Up to 30% lower beam reinforcement demand

When Should C-JOIST Enter Your Project?
Fast joist erecton
Low
Low
Low
High
Low
EARLY INTEGRATION — MAXIMIZE BENEFITS
Engineers optimize:
• Beam Sizes
• Reinforcement
• Structural Spans
• Supporting Members
DESIGN STAGE
Low
Low-Medium
High
Cost Consideration

C-JOIST + site topping
Low
Low
Reduced
Steel Deck
Steel Deck + site cast
Low-Moderate
Low-Moderate
Reduced
Site-Cast
Longer, labor-intensive
High
High
High
Conventional
C-JOIST
Fast deck installation
Low
Medium
High
Low
High
Moderate
Moderate-High
Medium-High
High
High



Construction Method
Rethinking the conventional floor.
Installation
Job Site Materials
Dead Load
Formwork Extent
Shoring
On-Site Labor
Structural Optimization
Concrete Consumption
Supporting Beam Demand
Construction Speed

BUILT STRUCTURE
Still offers benefits,
subject to engineering review.
LATER INTEGRATION — STILL BENEFICIAL
Send your floor framing plans to get a quote.